Is Revenue Recognised Over Time or at a Point in Time?

The three IFRS 15 (TFRS 15) criteria for recognising revenue over time, alternative use and right to payment, measuring progress and contract assets, with a customer-specific machine example and the BOBİ FRS approach.

Whether revenue is recognised over time or at a point in time can change period profit significantly, especially for customer-specific manufacturing, construction and long-term service contracts. IFRS 15 (TFRS 15) ties the answer to the transfer of control and sets three criteria for recognising revenue over time. This article explains those criteria, how progress is measured and how a contract asset arises, using a customer-specific machine as an example, and compares the outcome with the percentage-of-completion method in BOBİ FRS. In short, revenue recognised over time follows progress, while revenue at a point in time waits for the transfer of control.

Short Answer

Under IFRS 15 (TFRS 15), an entity recognises revenue when (or as) it transfers control of a promised good or service to the customer (TFRS 15, paragraph 31). At contract inception, it determines whether each performance obligation is satisfied over time or at a point in time (TFRS 15, paragraph 32). Revenue is recognised over time if one of three criteria is met: the customer simultaneously receives and consumes the benefits as the entity performs; the entity’s performance creates or enhances an asset the customer controls; or the asset created has no alternative use to the entity and the entity has an enforceable right to payment for performance completed to date (TFRS 15, paragraph 35). If none is met, revenue is recognised at the point in time control transfers (TFRS 15, paragraph 38).

Requirements that apply

TFRS 15 paragraphs on the timing of revenue
Paragraph Topic
31–32 Transfer of control and determining timing at contract inception
35–37 Over-time criteria, alternative use, right to payment
38 Indicators of transfer of control at a point in time
39–45 Measuring progress
105, 107 Contract assets and receivables

How are the three criteria applied?

(a) Does the customer receive and consume the benefits simultaneously?

For recurring services such as cleaning, security or routine maintenance, the customer consumes the benefit as the service is provided. Revenue is generally recognised over time.

(b) Is the asset created under the customer’s control?

For an asset whose control passes to the customer as it is created, such as construction on the customer’s land, revenue is recognised over time.

(c) No alternative use and a right to payment?

Revenue is recognised over time if the asset has no alternative use to the entity, meaning the entity is restricted contractually or practically from readily directing it to another use (TFRS 15, paragraph 36), and the entity is entitled, if the customer terminates for reasons other than the entity’s failure to perform, to an amount that at least compensates for performance completed to date (TFRS 15, paragraph 37). Both the contract terms and the laws that apply to the contract are considered.

How is progress measured?

For each performance obligation satisfied over time, a single method of measuring progress that depicts the transfer of control is selected and applied consistently to similar contracts (TFRS 15, paragraphs 39 and 40). Output methods (units delivered, milestones reached) or input methods (costs incurred, labour hours) may be used (TFRS 15, paragraph 41). Under a cost-based input method, costs that do not contribute to progress, such as significant inefficiencies not reflected in the contract price, are excluded (TFRS 15, paragraph B19). If progress cannot be reasonably measured but costs are expected to be recovered, revenue is recognised only to the extent of costs incurred (TFRS 15, paragraph 45).

Worked example

Amounts are hypothetical; VAT is not included.

Assumptions

  • Company J is manufacturing a production-line machine designed specifically for a customer’s plant. The contract price is TRY 5,000,000 and estimated total cost TRY 4,000,000.
  • Because of its customer-specific design, the machine could be sold to another customer only after significant rework. If the customer terminates, the contract entitles Company J to payment for work completed to date including a reasonable margin, and that right is legally enforceable.
  • At 31 December 2026 costs incurred are TRY 1,700,000, of which TRY 100,000 is wastage from faulty material cutting not reflected in the contract price.
  • TRY 1,500,000 has been invoiced to the customer during the year.

Assessment and calculation

There is no alternative use and there is a right to payment; TFRS 15, paragraph 35(c) is met, so revenue is recognised over time. A cost-based input method is used.

Progress = (Costs incurred − Inefficiency) / Estimated total cost = (1,700,000 − 100,000) / 4,000,000 = 40%

2026 revenue = 5,000,000 × 40% = TRY 2,000,000

Cost of sales = TRY 1,600,000; in addition, TRY 100,000 wastage is a period expense.

Contract asset = Revenue recognised − Amount invoiced = 2,000,000 − 1,500,000 = TRY 500,000

Independent check

Expected gross profit on the contract is 5,000,000 − 4,000,000 = TRY 1,000,000. At 40% progress, TRY 400,000 should be recognised: 2,000,000 − 1,600,000 = TRY 400,000. The wastage hits the result as a separate period expense, not through the contract margin. Had it not been excluded from progress, the ratio would be 1,700,000 / 4,000,000 = 42.5% and revenue would be overstated by TRY 125,000.

Illustrative journal entries

The Turkish uniform chart of accounts has no specific code for contract assets, so a descriptive name is used; IFRS 15 does not prescribe account codes. Costs are assumed to be accumulated in cost accounts and transferred to cost of sales at period end.

Illustrative entry 1: recognising revenue
Account Debit Credit
Contract assets 2,000,000
600 Domestic sales 2,000,000
Illustrative entry 2: invoicing
Account Debit Credit
120 Trade receivables 1,500,000
Contract assets 1,500,000
Illustrative entry 3: transferring costs to expense
Account Debit Credit
621 Cost of goods sold (contract costs) 1,600,000
Inefficiency loss (period expense) 100,000
Contract costs (cost accounts) 1,700,000

Effect on the financial statements

  • Profit or loss: revenue TRY 2,000,000, cost of sales TRY 1,600,000, plus TRY 100,000 wastage expense.
  • Statement of financial position: a trade receivable of TRY 1,500,000 (unconditional right) and a contract asset of TRY 500,000 are presented separately (TFRS 15, paragraphs 105 and 107).
  • Alternative scenario: without the right to payment, revenue would be recognised when the machine is delivered. 2026 revenue would be nil; TRY 1,600,000 would remain in work in progress and the TRY 100,000 wastage would still be expensed.

Position under BOBİ FRS

The BOBİ FRS revenue section uses a different structure from the IFRS 15 control model. For sales of goods, revenue is not recognised while significant risks and rewards of ownership are retained by the seller (BOBİ FRS, paragraph 5.16). Contracts specifically negotiated for the construction of an asset are defined as construction contracts (BOBİ FRS, paragraph 5.22), and where the outcome can be estimated reliably, revenue and costs are recognised by the percentage-of-completion method (BOBİ FRS, paragraph 5.23). Completion may be measured, for example, by costs incurred to estimated total costs (BOBİ FRS, paragraph 5.31); progress billings and advances generally do not reflect the stage of completion (BOBİ FRS, paragraph 5.32). BOBİ FRS is a Turkish framework and is not equated with IFRS here.

Because the machine in the example is designed specifically for the customer, it may fall within the BOBİ FRS definition of a construction contract; that assessment does not require the IFRS 15 right-to-payment test. The outcome may point the same way, but the reasoning differs. The difference becomes clear for standard product sales and for customer-specific production without a right to payment. Under BOBİ FRS, the difference between revenue recognised and amounts billed is presented as “receivables (or payables) from construction contracts in progress” (BOBİ FRS, paragraph 5.35).

Common mistakes in practice

  • Recognising revenue on the invoicing schedule; billings often do not reflect progress.
  • Recognising revenue over time for customer-specific production without documenting the right to payment under the contract and applicable law.
  • Including inefficiencies and uninstalled materials in a cost-based progress measure.
  • Presenting contract assets and trade receivables as a single line.
  • Not updating the estimate of total costs each period.
  • Skipping the onerous contract assessment for loss-making contracts.

Checklist

  • Is the over-time or point-in-time decision documented at inception for each performance obligation?
  • For 35(c), are alternative use and the right to payment supported by a legal view?
  • Is the progress method consistent across similar contracts?
  • Have costs to be excluded from progress been separated?
  • Are contract assets, contract liabilities and receivables presented separately?

For the contract asset concept see contract assets versus receivables; for revenue differences between the frameworks see IFRS 15 versus BOBİ FRS.

Sources

This article is for general information. The standard text and professional judgement should be applied to the specific facts of an entity.